11 de diciembre de 2015 / 6:14 / en 2 años

BRIEF-Gamesa signs contract to build 130 MW wind farm in Mexico

Dec 11 (Reuters) - Gamesa Corporacion Tecnologica SA :

* Signs contract with Mexico Power Group and First Reserve to build 130 MW wind farm located in the state of Zacatecas, in Central Mexico

* Says it will install 65 of its G114-2.0 MW turbines and handle all of the infrastructure needed to install and operate the project

* The turbines are slated for delivery in 2016, with commissioning to be completed the same year Source text: bit.ly/1lToBW9

Further company coverage: (Gdynia Newsroom)

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below